Lower water level, disconnect /winterize lines, drain & winterize pump and filter system (heater, chlorinator if they apply), remove solar blanket for customer to store, install customer's winter cover. Customer is responsible for removing drop-in step if required. Test and balance water 1-2 weeks prior to closing and double shock pool 2-3 days prior to closing (allow pump and filter to run continuously), vacuum & backwash pool.